Redevelopment plans submitted for new Gurnell Leisure Centre in Ealing

The plans include a 50-metre swimming pool (Image: pexels.com/PixaBay)

A planning application has been submitted for a new leisure facility to replace the existing Gurnell Leisure Centre in Ealing, London.

The “radically new” designs for the centre have been drawn up by a team led by GT3 Architects and include a 50-metre swimming pool, learner pool and leisure water area, alongside a gym with studio spaces and a climbing wall. 

Built in the 1970s, Gurnell Leisure Centre’s declining state led to its permanent closure in August 2020.

Plans to redevelop – or rebuild – the centre have been on hold since 2021, when previous proposals for a new centre were rejected by Ealing Council’s planning committee. 

The previous plans, which included the demolition of the original leisure centre and 600 new homes across six buildings, were turned down due to having an “unacceptable impact” on its surroundings. 

Since then the council, as the developer for the site, has been reviewing a range of proposals. 

The fresh plans, led by GT3, submitted to the council have seen the residential element being reduced.

"We want a destination leisure centre to serve residents, families, and the next generation of sporting champions. This radically different masterplan reflects that vision" – Peter Mason

Paul Reed, the sport and leisure sector lead at GT3 Architects, said: “We are delighted to be leading the design team for the replacement of this iconic leisure facility for Ealing Council, alongside 300 homes as part of a wider master plan. 

“A lot of work has gone into getting to this key landmark. Well done to the whole team involved.” 

Ealing Council leader, Peter Mason, added: “We want a destination leisure centre to serve residents, families, and the next generation of sporting champions. This radically different masterplan reflects that vision.

“Built in the 1970s, the old Gurnell had reached the end of its useful life. Deciding to close the existing leisure centre was a difficult but well-thought-out decision.

“Independent advisors have made it clear that a new centre is the most environmentally friendly and cost-effective solution for the site. This means we have a chance to change the face of leisure in the borough, build upon some of the excellence we have already seen at centres like Acton, and provide first-class facilities for people of all ages and abilities.

“We have listened to feedback from residents, sports groups, and centre users about their objections to the first, failed planning application. The new plan reflects and responds to previous concerns about the height and number of residential units.

“There has also been a strong emphasis on reusing key elements of the building to help reduce waste and cost but also stay true to our values of being as sustainable as possible in all council developments.”

Recommended Posts