Designs unveiled for £31.1m Cranleigh Leisure Centre designed to Passivhaus standards

Designed by GT3 architects, the centre will be an “ultra-low energy use” venue” (Image: Waverley Borough Council/GT3 Architects) 

Detailed designs have been revealed for the new £31.1m Cranleigh Leisure Centre, which is set to open by the end of 2026.

Designed by GT3 Architects, the venue will be an “ultra-low energy use leisure centre” and aims to achieve Passivhaus Trust certification. It will offer a range of sustainable facilities. These include a six-lane, 25m swimming pool, a teaching pool with moving floor, dedicated spectator seating, a children’s soft play facility and a café area.

There will also be a health club with a large gym floor, two multi-purpose exercise studios, an indoor cycling studio and a dedicated health studio. 

The centre will be owned by Waverley Borough Council, which says the centre will contribute to the council’s commitment to becoming carbon neutral by 2030.

The final designs were shaped by feedback from more than 800 responses to an online survey, and two public engagement sessions, which were attended by more than 200 people earlier this year.  

Waverley Borough Council Portfolio Holder for Planning, Regeneration and Economic Development, Councillor Liz Townsend, said: “I want to thank everyone who has contributed their ideas and comments to this fantastic project. 

“The result is a great mix of facilities, given the various demands we have to balance, such as budget, sustainability, indoor facilities versus outdoor space for parking, as well as creating a future proof offer to support community health and wellbeing. 

“We have listened to your requests for more parking and have incorporated an increased amount of parking spaces from 235 in the initial proposal to 300 in the final design.” 

A feasibility study conducted by the council in 2021, revealed the need to update the existing leisure centre in Cranleigh to make it fit for purpose for both the current and next generation of users. The budget for the new centre is £31.1m and was approved by Waverley Borough Councillors last year. 

Paul Reed, Director at GT3 Architects, said: “As part of the design process we have looked, in detail, at the strong local vernacular and rural character of the local conservation area to ensure the design can respond to the local village. 

“The final design provides a contemporary response to pitched roof context and prevalence of local brickwork. We have created welcoming and bright indoor spaces for a great variety of activities, and room to socialise, play and relax. 

“Designing and building to achieve the Passivhaus standards is very challenging, particularly for a leisure centre. The new highly sustainable leisure centre will be something for the community to be extremely proud of for many years to come”   

Waverley Borough Council aims to begin construction of the new leisure centre in summer 2025 and open by the end of 2026 or early 2027. This is subject to planning permission being granted. Residents will now be able to give feedback on the project via the formal planning application process.

Recommended Posts